Delay and Its Effect on The Delivery of Construction Projects In Ghana

Authors

  • J N T Addo Cape Coast Polytechnic

Keywords:

Delay, Delivery, Construction, Effect, Ghana

Abstract

It is common knowledge that our construction industry in this country has been bedeviled with a lot of delayed and uncompleted projects. Delays can be minimized when the factors causing them are identified. The objective of this study was therefore to identify the various delay factors that affect the delivery of construction projects, the effects of delays on the delivery of construction projects, and assess and identify the most critical delay factors that affect construction project delivery in Ghana. During the review a total of fifty-seven factors were identified and categorized into eight groups that contributed to the causes of delays. Six effects of these delays on construction projects and thirty five methods of minimizing construction delays were identified. Questionnaires were distributed to targeted respondents mainly contractors belonging to Association of Building and Civil Engineering Contractors, as well as Consultants who were on good standing with the Department of Feeder Roads. Results from the research indicated that the top three out of the ten most critical factors that cause delays in the delivery of construction projects were; Shortage of construction materials, poor site management practices and poor supervision. In order to minimize the effects of  delays, it was recommended that contractors' managerial skills and technical knowledge be improved through frequently organized seminars, workshop and training programs which would help update their knowledge on project management techniques and processes.

Author Biography

J N T Addo, Cape Coast Polytechnic

A Lecturer at the Polytechnic

References

Aibinu, A. A., and Jagboro, G. O. (2002). The effects of Construction Delays on Project Delivery in Nigerian Construction Industry. International Journal of Project Management 20, 593-599.

Al-Saggaf, H. A. (1998). The Five Commandments of Construction Project Delays Analysis. Construction Engineering, ASCE, 40(4), 37-41

Bubshait, A. A., and Cunningham, M. J. (1998). Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), 315-322.

Chan, D.M.W., and Kumaraswamy, M.M. (1996). A Comparative Study of Causes of Time Overruns in Hongkong Construction Projects. International Journal of Project Management, Elsevier, 15 (1), 55-63

Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries, Ghana as a case study. International Journal of Project Management, 21, 321-326.

Koushki, P.A., Al-Rashid, K., and Kartam, N. (2005). Delays and Cost increase in the Construction of Private Residential Projects in Kuwait. Construction Management and Economics Journal, 23 (3), 285-294.

Long, D. N., Ogunlana, S.O., Quang T., and Lam. K.C. (2004). Large Construction Projects in Developing Countries, a case study from Vietnam. International Journal of Project Management, 22, 553-561.

Majid, M. A., and McCaffer, R. (1998). Factors of non-excusable delays that influence contractor performance. Journal of Management in Engineering, 14(3), 42-49.

Odeh, A. M., and Battaineh, H.T. (2002). Causes of Construction Delay: Traditional Contracts. International Journal of Project management, 20, 67-73.

Ogunlana, S.O., Promkuntong, K., and Jearkjirm, V. (1996). Construction Delays in a Fast-Growing Economy: Comparing Thailand with Other Economies. International Journal of Project Management, 14(1), 37-45.

Downloads

Published

2016-03-10

How to Cite

Addo, J. N. T. (2016). Delay and Its Effect on The Delivery of Construction Projects In Ghana. AFRICAN JOURNAL OF APPLIED RESEARCH, 1(1). Retrieved from https://ajaronline.com/index.php/AJAR/article/view/151