Influence of Workforce on Productivity of Labour Intensive Works on Feeder Road Construction in Ghana

Authors

  • E. Bamfo-Agyei Cape Coast Technical University, Ghana
  • D. W. Thwala Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.
  • C. O. Aigbavboa Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.

Keywords:

Ghana; Intensive; Labour; Productivity; Road; Workforce

Abstract

Construction labour productivity is regarded as an effective indicator of the efficiency of industry activities. This research aims to develop a labour productivity framework based on worker component in achieving construction labour productivity in labour-intensive public works in Ghana. The objectives are to identify the factors that affect labour productivity on the sites and evaluate the effect of the identified factors that affect labour productivity in Ghana and develop a worker framework for labour-intensive works. Purposive sampling technique was used to select 40 districts as they were into road construction projects. Out of 120 sites, one facilitator, one-time keeper, one site engineer and one contractor from each site were selected making a total of 480 respondents and 80 comprised district engineers and GSOP desk officers. Out of 560 respondents, 543 gave a complete response to the questionnaire which gave a response rate of 97%. Exploratory factor analysis was used to classify the factors into components and structural equation modelling was used to develop the worker component labour productivity framework in which the importance of the factors in the component was evaluated based on the strength of their impact. Principal axis factoring revealed the presence of four (4) components with eigenvalues above 1 and these are Component Age of worker; Workers’ knowledge; Safety Compliance and Motivation of worker. However, the structural equation modelling indicated the motivation of workers and the age of workers influenced the worker component with 0.662 and 0.614 as correlation figures respectively. The novelty of this study also lies in the labour productivity framework for labour-intensive works on road construction, it informs as to the variables that affect the worker component that determines labour productivity of labour-intensive works on road construction in the Ghanaian construction industry.

Author Biographies

E. Bamfo-Agyei, Cape Coast Technical University, Ghana

He is a Senior Lecturer at the Department of Building Technology, Cape Coast Technical University, Ghana

D. W. Thwala, Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.

He is a Professor with the Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.

C. O. Aigbavboa, Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.

He is a Professor at the Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa.

References

Abdel-Wahab, M. S. (2008). An examination of the relationship between skills development and productivity in the construction industry. Loughborough University/© Mohamed Samir Abdel-Wahab.

Abrey, M., and Smallwood, J. J. (2014). The effects of unsatisfactory working conditions on productivity in the construction industry. Procedia Engineering, 85, 3-9.

Attar, A. A., Gupta, A. K., and Desai, D. B. (2012). A study of various factors affecting labour productivity and methods to improve it. IOSR Journal of Mechanical and Civil Engineering, 1(3), 11-14.

Bernold, L. E., and AbouRizk, S. M. (2010). Managing performance in construction. John Wiley & Sons.

Dai, J., Goodrum, P. M., and Maloney, W. F. (2009). Construction craft workers’ perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), 217-226.

Dixit, S., Pandey, A. K., Mandal, S. N., and Bansal, S. (2017). A study of enabling factors affecting construction productivity: Indian scenario. International Journal of Civil Engineering & Technology, 8(6), 741-758.

Durdyev, S., and Mbachu, J. (2018). Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), 385-393.

Durdyev, S., Ismail, S., and Kandymov, N. (2018). Structural equation model of the factors affecting construction labour productivity. Journal of Construction Engineering and Management, 144(4), 04018007.

El-Gohary, K. M., and Aziz, R. F. (2014). Factors influencing construction labour productivity in Egypt. Journal of management in engineering, 30(1), 1-9.

Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). Causes of delay and cost overruns in the construction of groundwater projects in developing countries: Ghana as a case study. International Journal of Project Management, 21, 321-326

Fugar, F. D., and Agyakwah-Baah, A. B. (2010). Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), 103-116.

Ghana Statistical Service (GSS) (2018) Ghana Living Standard Survey (GLSS 7) 2017

http://www2.statsghana.gov.gh/nada/index.php/catalog/97/study-description

Ghoddousi, P., Poorafshar, O., Chileshe, N., and Hosseini, M. R. (2015). Labour productivity in Iranian construction projects: Perceptions of chief executive officers. International Journal of Productivity and Performance Management, 64(6), 811-830.

Horner, R. M. W., Talhouni, B. T., and Thomas, H. R. (1989). Preliminary results of major

labour productivity monitoring programme. In Proceedings of the 3rd Yugoslavian Symposium on Construction Management, Cavtat (pp. 18-28).

Jarkas, A. and Bitar, C. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management, 138 (7), 811-820.

Kazaz, A., Manisali, E., and Ulubeyli, S. (2008). Effect of basic motivational factors on

construction workforce productivity in Turkey. Journal of civil engineering and management, 14(2), 95-106.

Khosrowpour, A., Niebles, J. C., and Golparvar-Fard, M. (2014). Vision-based workforce assessment using depth images for activity analysis of interior construction operations. Automation in Construction, 48, 74-87.

Lindsay, C. (2004). Labour productivity. Labour Market Trends, 112, 447-456.

Mincks, W. R., and Johnston, H. (2010). Construction Jobsite management. Cengage Learning.

Rojas, E. M., and Aramvareekul, P. (2003). Labour productivity drivers and opportunities

in the construction industry. Journal of management in engineering, 19(2), 78-82.

Soekiman, A., Pribadi, K. S., Soemardi, B. W., and Wirahadikusumah, R. D. (2011). Study on factors affecting project level productivity in Indonesia. Annals of the Faculty of Engineering Hunedoara, 9(3), 35.

World Bank (2018) Implementation Completion and Results Report For Ghana Social

Opportunities Project. The Republic of Ghana. Report No: ICR00004555 http://documents.worldbank.org/curated/en/768021546546059481/pdf/icr00004555-12282018-636818041941271427.pdf Retrieved January 14, 2019

Zayed, T. M., and Halpin, D. W. (2005). Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), 779-789.

Zeiss, G. (2007). Worldwide Challenges Facing the Construction Industry. https://geospatial.blogs.com/geospatial/2007/09/convergence.html Retrieved 14/11/2017

Downloads

Published

2020-05-14

How to Cite

Bamfo-Agyei, E., Thwala, D. W., & Aigbavboa, C. O. (2020). Influence of Workforce on Productivity of Labour Intensive Works on Feeder Road Construction in Ghana. AFRICAN JOURNAL OF APPLIED RESEARCH, 6(1), 91–104. Retrieved from https://ajaronline.com/index.php/AJAR/article/view/351